Our EconoTent displays are printed on 8.8oz. Tension fabric on the front and attached to the lightweight but durable aluminum frame with velcro. The display can be stored with the graphic connected, so after the initial installation, setting up the display is as simple as expanding the frame and locking it into place..

EconoTent Options:

  • Size: 10'x10'
  • Material: 8 oz. Tension Fabric
  • Print Color: 4/0
  • Case: Black Nylon Bag (Included)
  • Hardware: 30mm Steel Frame
  • Production Time: 3 Business Days
  • Design Options: Custom Graphic Design, Upload Print-ready files

 

 Free UPS Ground shipping is only available for orders shipping to the contiguous 48 states.

 

Standard Production: 3 Business Days

Standard Production Calendar

Order placed and approved before 2:00 PM EST

 

Standard Production Calendar

Order placed and approved after 2:00 PM EST

 

Please note the cutoff times for production:

  • Standard Production: 2:00 PM EST

*An order must be placed, print-ready files must be uploaded, payment must be made, and order needs to be approved before the cutoff time. Unpaid orders, bad files, or incomplete information may delay an order beyond the cutoff time.

Please allow up to 1 business hour for us to review and approve your project.

 

Ground Shipping Estimated Transit Times

The EconoTent ships from our West Coast facility.

transit time map for value banner stands

shipping time color key

 

Transit times are only an estimate to be used as a reference.

Ground shipping transit times are not guaranteed.

In addition to the option of uploading print-ready files for your EconoTent artwork, we also offer Custom Graphic Design services.

Our skilled graphic designers, located in Denver, Colorado can create custom, studious artwork for your EconoTent project. To secure graphic design services for your EconoTent project, be sure to choose the "Yes, I need custom Graphic Design" option in the pricing calculator.

EconoTent Graphic Design

  • Logo Placement & Typesetting: 2-3 Business Days
    • 1 Design (1 Panel repeating): $99
    • 2 Designs (2 Panels alternating): $149
    • 3 Designs (Custom arrangement): $199
    • 4 Designs (Custom arrangement): $249
  • Full-color Standard package: 3-5 business days
    • 1 Design (1 Panel repeating): $199
    • 2 Designs (2 Panels alternating): $298
    • 3 Designs (Custom arrangement): $397
    • 4 Designs (Custom arrangement): $496
  • Full-color Expedited package: 2-3 business days
    • 1 Design (1 Panel repeating): $299
    • 2 Designs (2 Panels alternating): $447
    • 3 Designs (Custom arrangement): $596
    • 4 Designs (Custom arrangement): $744

The Graphic Design service includes:

  • Original Design
  • Up to 3 revision rounds
  • Automatic Upload to Project
  • PDF Artwork File

Price Calculator

The Polyester fabric material is lightweight, washable, and scratch resistant.

4/0 - Full-color on outside only. The EconoTent is printed on the top and outside valances. The inside "ceiling" of the tent and the inside of the valences are not printed.

Production Time: Is how long we estimate it will take to produce your product.

Production time for your project begins once your order has been placed, paid for, and print-ready files have been approved by us for printing. The cutoff time determines when the production time countdown begins. Custom graphic design, errors, special requests, or other variables will add additional production time.


Cutoff Time: Is the time we stop accepting projects for that day's production.

Cutoff time for Standard Production is 2:00 PM EST. (3 Business Days)

This means if your project is approved before 2:00 PM EST production time begins counting from that day. If your project is approved after 2:00 PM EST production time will start the following business day.

Please allow up to 1 business hour for us to review and approve your project.


 Please note. Our offices are closed on Saturdays, Sundays, and Holidays. This means that these days are not considered when calculating production time.

 Please note. Production time does not include shipping time. This means that you should allow additional business days for delivery based on the shipping method you select.

 Please note. Production time completion day ends at 11:59 PM EST. This means that although we make every effort to complete a project and have it picked up by the shipping carrier on or before the last production day, in certain situations the project may be finished and packed for shipping after our last shipping carrier pickup. This means that although the project has been completed and packaged, it will not be picked up by the shipping carried until the following day.


Total :$ 549.00
Estimated Total :$ 549.00

Product Review